FAMILY SELECTOR / 01
Residential
Match the module to usable roof area, mounting requirements and the electrical design.
- Usable roof area
- Mounting interfaces
- Electrical design

PRODUCT FAMILY / Rooftops · campuses · portfolios
Bring the facility layout, operating requirements and procurement milestones into one conversation. Review the exact article against the project’s structural and electrical design.

01 / INSPECT THE INTERFACES
ZLK 5P candidate series
Supplied series datasheet · p.2
2465 × 1134 × 30 mm nominal envelope; 33.5 kg. External dimensions follow the cited company-published record. Confirm the current release before design.
02 / COMPANY-PUBLISHED SOURCE RECORD
This family does not publish a standalone numeric record table in the supplied page. Its engineering context is retained below; request the current model record for selection.
03 / ENGINEERING CONTEXT
The original six engineering chapters are retained with their source context. Treat source-dependent claims as company-published until the applicable current record is reviewed.
01 / Origin
Select the exact module before discussing its glass, conversion layer, frame and connections. Material lots and supplier records establish the applicable origin.
Configuration-specific bill of materials
02 / R&D
Centauri Renewable Corporation controls R&D. Commercial use introduces questions about roof interfaces, operating temperatures, load patterns and system integration.
Research questions → engineering requirements
03 / Architecture
The ZLK 5P studio presents the supplied 620–645 W series as a candidate for review. Its 2465 × 1134 × 30 mm envelope does not establish suitability for every commercial roof.
EA-ZLK-5P-BE-MP-182 · supplied series datasheet · p.2
04 / Manufacture
Connect the candidate model to the approved construction, assembly history and inspection requirements. Manufacturing imagery explains the process; the records identify the actual article.
Defined model → controlled assembly → inspection
05 / Inspect
Check structural load, fire access, electrical architecture and applicable certificates with the site team. Keep origin, FEOC and warranty applicability tied to the selected configuration.
Product review + site engineering review
06 / Application
Explore rooftops, campuses and distributed generation. Enter the real load and usable area before preparing the engineering brief.
Load context → system concept → project review
NEXT STEP
Share the application, design constraints and expected purchasing timeline. No order is created by preparing an inquiry.